ABB PVS300 Product Manual page 80

String type solar inverters
Hide thumbs Also See for PVS300:
Table of Contents

Advertisement

80 Start-up
First start-up
The time appears in the middle of the Soft Key
bar.
Select the installation country with the Up or
Down Arrow keys. The correct installation
country must be selected otherwise correct grid
connection parameters are not activated and
the inverter shall not start operation. If the
correct installation country is not in the list,
contact your inverter supplier and verify that the
inverter can be used in your country.
Press the right softkey to Save the Installation
Country selection and to proceed forward.
Check the Date, Time and Installation country
selections.
Navigate Back with the left softkey if
corrections are required.
Press the right softkey to confirm installation
country.
Note: After confirmation only authorized ABB
service partners can make modifications to
Installation Country. The inverter shall update
internal settings and it shall be ready for
automatic operation.
The "Output: Today" view shall appear in the
display.
Turn the DC switch ON to position 1.

Advertisement

Table of Contents
loading

Table of Contents