Page 1
A I R C O N D T I O N E R S XC16 ELITE Series ® R-410A - Two-Stage Compressor - SilentComfort™ Technology E N G I N E E R I N G D A T A Bulletin No.
Coil is factory tested under high pressure to insure energy, help save money on utility bills, and help protect leakproof construction. the environment. Entire coil is accessible for cleaning. For expanded ratings, see www.lennoxdavenet.com. XC16 - 2 to 5 Ton Heat Pump / Page 2...
Page 3
Low gas pulses during compression reduces operational sound levels. XC16 - 2 to 5 Ton Heat Pump / Page 3...
Page 4
See Indoor Blower Speed Relay dimension drawing. Relay kit provides optimum humidity control conditions by automatically reducing indoor blower speed during continuous fan or first-stage compressor operation. XC16 - 2 to 5 Ton Heat Pump / Page 4...
Refer to National or Canadian Electrical Code manual to determine wire, fuse and disconnect size requirements. Hard start kit is required in applications where the supply voltage is less than 230V. XC16 - 2 to 5 Ton Heat Pump / Page 5...
6 in. (152 mm). A clearance of 24 in. (610 mm) must be maintained between two units. Control See NOTES 48 in. (1219 mm) clearance required on top of unit. XC16 - 2 to 5 Ton Heat Pump / Page 6...
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 9
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 10
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 11
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 12
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 13
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 14
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 15
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 16
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 17
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 18
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 19
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 20
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 21
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 22
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 23
25 ft. of connecting refrigerant lines. All ratings include the use of a blower time delay relay (TDR). All Lennox variable-speed furnaces and Air Handlers have time delay capabilities. Other Furnaces and Air Handlers may require an optional time delay relay (58M81) for field installation. See furnace or air handler specifications to determine if relay is needed.
Page 24
Contact us at 1-800-4-LENNOX NOTE - Due to Lennox’ ongoing commitment to quality, Specifications, Ratings and Dimensions subject to change without notice and without incurring liability. Improper installation, adjustment, alteration, service or maintenance can cause property damage or personal injury.
Need help?
Do you have a question about the XC16 and is the answer not in the manual?
Questions and answers