Weil-McLain Gold CGi Series 2 User Manual page 19

Gold cgi series 2 gas-fired water boiler
Hide thumbs Also See for Gold CGi Series 2:
Table of Contents

Advertisement

Boiler Manual
vertical or sidewall
Figure 15 Sidewall termination
Termination elbow or tee
Termination elbow or tee
Termination elbow or tee
Sealant
Termination elbow or tee
Part Number 550-110-710/0200
Elbow and termination
coupling with screen
Sealant
Sealant
Note 1
Elbow and termination
coupling with screen
Sealant
Note 1
Termination coupling
not available
Sealant
Note 1
Elbow and termination
coupling with screen
Locking
band
Note 1
Using any termination other than one of those shown
could cause nuisance outages and loss of heat, resulting
in substantial property damage.
Sealant
18" Slip
connector
Note 1: DO NOT use horizontal tee with CGi-7 or CGi-8.
Sealant
Sealant
Pipe
section
Note 1: DO NOT use horizontal tee with CGi-7 or CGi-8.
Sealant
Pipe
section
Note 1: DO NOT use horizontal tee with CGi-7 or CGi-8.
Note 1: DO NOT use horizontal tee with CGi-7 or CGi-8.
Pipe
section
section
Metal
plate
Band
clamp
E x t e
M e t
r i o r
a l
w a l
p l a t
l
e
Pipe section
Metal
plate
Sealant
E x t e
M e t
r i o r
a l
w a l
p l a t
l
e
Metal
plate
E x t e
M e t
r i o r
a l
w a l
p l a t
l
e
Pipe section
Metal
plate
E x t e
M e t
r i o r
a l
w a l
p l a t
l
e
Pipe
Pipe
section
71017
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents