Please note before commissioning
Filling the heating system
Filling the siphon
Siphon
Fig.: Siphon CGB-75/100
Opening the shut-off equipment
Maintenance valve
Heating flowf
Close
Open
Checking the water level
3061345_0609
Water connections and
gas supply connection
The heating system must be completely filled with water. If necessary top up with water.
Whilst filling the heating system, keep the shut-off valves open and check the system
pressure at the control unit housing. The system pressure must lie inside the green
marking. The connection between the tap water and heating water required for filling
must be removed after the fill has been completed. Otherwise there is a risk that your
tap water will be contaminated by heating water.
The system may overheat if the boiler is operated without water.
NOTE
Inhibitors are not permissible as there is a risk of damage to the boiler.
The siphon must be fitted and filled.
Siphon
Fig.: Siphon CGB-11/20/24,
CGB-K-20/24
Warm water valve only
combination boilers
Gas shut-off valve
Open:
Push and turn anti-clockwise
Close:
Turn clockwise
Regularly check the water level. The pressure gauge must indicate between 2.0 and 2.5
bar. Your heating contractor will explain how to top up your system. Do not supplement
your heating water with additives, as components may be damaged.
Cold water valve only
combination boilers
Condensate drain
Siphon
Fig.: Siphon CGB-35/50
Maintenance valve
Heating flowf
Close
Open