To Drain The D.h.w. Circuit Of The Boiler; Setting Gas Pressures; Reducing The Maximum Output To Meet The Central Heating Power Requirements - Savio 20/1 MFS User Manual

Wall hung fan flue room sealed gas combination boiler
Table of Contents

Advertisement

Servicing instructions
6.4

To drain the d.h.w. circuit of the boiler

1
Close the cold water inlet cock;
2
open the drain tap of d.h.w. system or a draw ---off tap;
3
open the d.h.w. circuit drainage cock indicated.
6.5

Setting gas pressures

IMPORTANT
minimum gas pressure mut be set after maximum setting.
1
Open the boiler and operate as explained in sect. 4.7 from step
1 to step 5;
Setting the maximum gas pressure
2
turn the protective hood " A"counter---clocwise and remove it
from the calibration system. Use a flat---edge screw driver to
help removal;
3
rotate adjustment control " B"to adjust the maximum gas pres-
sure to the prescribed value. Rotate the control clockwise to in-
crease the pressure.
Setting the minimum gas pressure
4
Turn off the electrical supply;
5
remove the connector " C"to the gas modulator and make it
safe;
6
turn on the electrical supply;
7
rotate adjustment control " D" to adjust to the minimum pressure
prescribed value. Rotating the control clockwise increases the
pressure;
8
make sure that both minimum and maximum gas pressures are
correctly set by disconnecting and re---connecting the con-
nector " C"to the gas modulator;
9
close the domestic hot water cock;
10 install the protective hood over the calibration system on the gas
moulator;
11 securely close the gas pressure test point
12 close the appliance.
6.6
Reducing the maximum output to meet
the central heating power requirements
1
Ensure electricity is switched off at main isolator;
2
turn the function switch as indicated;
rev. 17.09.93
A
B
C
D
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Concept 400 20/1 mfs

Table of Contents