Download Print this page

Bosch GWH 2400 ES Installation Manual page 6

Pipe cover
Hide thumbs Also See for GWH 2400 ES:

Advertisement

6 |
5. Install the water heater cover. Tighten the 2 screws at
the bottom left and right.
6. Install the left side panel of the pipe cover with the right
angle bends facing the wall and down. Tighten the screws
to hand tight, then back out 1 turn. See Fig. 5.
Fig. 5
Left side panel installation
7. Install the right side panel the same way. Tighten the
screws to hand tight, then back out 1 turn.
8. Using four machine screws, mount the bottom panel on
the inside of the fl anges with the opening facing the
wall. See Fig. 6.
Technical specifi cations are subject to change without prior notice
Pipe Cover Installation Manual
Left side panel
Front
Bottom panel
Fig. 6
Bottom panel installation
9. Ensure all panels are straight and plum.
10. Finish installing the pipe work inside the pipe cover.
The drain from the relief valve and the condensate drain
(condensing models only) must extend below the pipe
cover.
11. Fit the front panel with the 2 notches facing up. See
Fig. 7.
Notch
Front panel
Fig. 7
Front panel
Pipe Cover Installation Manual | BTC 710003301 C | 06.2011
Rear
Right side panel
Notch

Advertisement

loading