Installation Fixture Of Outdoor Unit - Pridiom AOS090HR Installation Manual

High wall
Hide thumbs Also See for AOS090HR:
Table of Contents

Advertisement

INSTALLATION & REPAIR GUIDE
Split Wall-Mounted air conditioner
Inspections:
a. Check if the hooks at the top and bottom
are firmly fixed.
b. Check if the position of the master unit is
properly leveled.
c. The drain pipe should not curve upward
(Fig.5).
d. The drain pipe should be at the lower part
of the wall pipes (Fig. 5).
*

Installation fixture of outdoor unit

* Try to ship the product to the installation location in its original package;
* As the gravity center of the unit is not at the installation center, special caution should be taken
when using hoisting cables to lift it up;
* During shipping, the outdoor unit must not be slanted to over 45 degrees (Do not store the unit
in a horizontal way).
* Use expansion bolts to fix the mounting supports on the wall;
* Use bolts and nuts to fix the outdoor unit firmly on the supports and keep on the same level;
* If the unit is installed on the wall or at the rooftop, the supports have to be firmly fixed so as to
resist earthquake or strong wind.
Dimensions for parallel units installations
Connecting wires
Drain pipe
*
300mm(1')min
4
Fig.5
Connecting pipe
Wall pipe
Drain pipe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents