Input Voltage And Input Frequency; Circuit Breakers And Plugs; Customer-Supplied Rack; Power Distribution Units For Customer-Supplied Rack - Hitachi Universal Storage Platform VM Installation Planning Manual

Hide thumbs Also See for Universal Storage Platform VM:
Table of Contents

Advertisement

Input Voltage and Input Frequency

Table 2-7
Universal Storage Platform VM.
Table 2-7: Input Voltage and Input Frequency Requirements
Frequency
60Hz ±2Hz
50Hz ±3Hz

Circuit Breakers and Plugs

The PDU plugs are appropriate for the power sources at the installation
sites:
For installations within the U.S., the plugs are NEMA L6 30P, rated as
30A and 250V, and have two 16A circuit breakers with 20A trip values.
For installations outside the U.S., the plugs are IEC 309, rated as 32A
and 250V, and have two 16A circuit breakers with 20A trip values.

Customer-Supplied Rack

This section describes the power specifications and requirements for
installing the Universal Storage Platform VM storage system in a customer-
supplied rack.
Figure
battery backup chassis and four disk chassis
Figure
battery backup chassis and up to two disk chassis
Figure
battery backup chassis and no disk chassis
Figure
chassis
Figure
specifications
Figure
Power Distribution Units for Customer-Supplied Rack on page 2-33
Hitachi Universal Storage Platform VM Installation Planning Guide
lists the input voltage and input frequency requirements for the
Input Voltages (AC)
200V, 208V, or 230V
200V, 220V, 230V, or 240V
2-15: Maximum configuration - control frame, additional SVP/
2-16: Primary rack configuration - control frame, additional SVP/
2-17: Primary rack configuration - control frame, additional SVP/
2-18: Secondary rack configurations - including one or two disk
2-19,
Figure
2-20: Primary rack - power connection
2-21: Connecting to universal power supply (UPS)
Installation Requirements
Conditions
Tolerance (%)
1 Phase
+6% or –8%
2 Wire + Ground
1 Phase
+6% or –8%
2 Wire + Ground
2–25

Advertisement

Table of Contents
loading

Table of Contents