Table Of Contents; Introduction - Yunca Gas MEZZO Operations, Maintenance & Warranty Information

Hanging patio heater
Table of Contents

Advertisement

CONTENTS

INTRODUCTION

Congratulations on purchasing your YUNCA MEZZO HANGING PATIO HEATER.
CAUTION: This unit must be installed so as it is not exposed to moisture.
This unit is designed to be mounted to a ceiling and out of the rain. The
operation is controlled by electronic 24 volt Microprocessor based direct spark
ignition control. The heater is started by turning on a switch.
WARNING:
The Gas supply shall be fitted and commissioned by a registered Gas Fitter.
WARNING:
The Electrical wiring shall be completed by an Qualified Electrician to
applicable Local Body and/or National standards.
WARNING:
The controller uses voltages of shock hazard potential.
WARNING:
Only authorised service technicians should undertake any repairs or
maintenance on this product.
It is recommended that the Heater has an annual maintenance check to ensure
its long term correct operation.
WARNING:
Do not store or use aerosols or other flammable materials near this
appliance.
WARNING:
The Yunca MEZZO Hanging Patio Heater is an unflued gas appliance
so adequate ventilation must always be provided to ensure safe and efficient use.
Each Yunca MEZZO Hanging Patio Heater is factory set to the appropriate operating
pressure for the gas type. Operating pressure is adjusted at either the LPG or NG in
line regulator.
This instruction booklet should stay with the appliance, and is for the reference of the
user and service person.
Please fill out and return the warranty registration card promptly (back page).
Page 2 of 12
Pg. 2
Pg. 3
Pg. 7
Pg. 7
Pg. 9
Pg. 10
Pg. 11
Pg. 12
Mezzo Hanging Patio Heater
29/10/10

Advertisement

Table of Contents
loading

Related Products for Yunca Gas MEZZO

Table of Contents