Normal Sequence Of Operation; General Instructions - UTICA BOILERS MGB50 Installation, Operation & Maintanance Manual

Mgb series cast iron gas fired boilers for forced hot water
Table of Contents

Advertisement

National Excelsior Company
www.excelsiorhvac.com
On a call for heat, the thermostat will actuate,
completing the circuit to the control. The completed
circuit to the control will first activate the circulator
and damper which will close an end switch inside
the damper. This action will complete the circuit to
the ignition system and ignition will take place.
In the event the boiler water temperature exceeds
the high limit setting on the boiler mounted high
limit control, power will be interrupted between the
control system and the ignition system. The power
will remain off until the boiler water temperature
drops below the high limit setting. The circulator
will continue to operate under this condition until
the thermostat is satisfied.
In the event the flow of combustion products through
the boiler venting system becomes blocked, the
blocked vent safety switch will shut the main burner
gas off. Similarly, if the boiler flueway becomes
blocked, a flame rollout safety switch will shut the
main burner gas off. (Figure #17) If either of these
conditions occur, DO NOT ATTEMPT TO PLACE
THE BOILER BACK INTO OPERATION. CON-
TACT A CERTIFIED SERVICE AGENCY.
Before seasonal start-up, have a certified service agency
check the boiler for soot and scale in the flues, clean the burn-
ers and check the gas input rate to maintain high operating
efficiency.
!
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Verify proper operation after service.
The service agency or owner should make certain the system
is filled with water to minimum pressure and open air vents, if
used, to expel any air that may have accumulated in the sys-
tem. Check the entire piping system and, if any leaks appear,
have them repaired.
Circulators need to be checked and maintained. Refer
to the circulator manufacturer's instructions.
The venting system should be inspected at the start of each
heating season. Check the vent pipe from the boiler to the
chimney for signs of deterioration by rust or sagging joints.
Repair if necessary. Remove the vent pipe at the base of the
chimney or flue and using a mirror, check vent for obstruction

NORMAL SEQUENCE OF OPERATION

GENERAL INSTRUCTIONS

CAUTION
Subject to change without notice.
INTEGRAL DRAFT
HOOD
BLOCKED VENT
SAFETY SWITCH
BURNER DOOR
BURNERS
MANIFOLD
JACKET BASE
PANEL
ORIFICES
and make certain the vent is in good working order.
The boiler flue gas passageways may be inspected by a light
and mirror. Remove the burner door. (Figure #20) Place a
trouble lamp in the flue collector through the draft relief open-
ing. With the mirror positioned above the burners, the flue gas
passageways can be checked for soot or scale.
The following procedure should be followed to clean the flue
gas passageways:
1.
Remove the burners from the combustion chamber by
raising the burners up from the manifold orifices and pull-
ing toward the front of the boiler. (Figure #20)
2.
Disconnect the vent pipe from the draft hood.
3.
Remove the top jacket panel.
4.
Remove the combination flue collector and draft hood
from the boiler castings by loosening the nuts on the hold
down bolts located on each side of the collector. (Figure
#17)
5.
Place a sheet of heavy paper or similar material over the
bottom of the base and brush down the flue passage-
ways. The soot and scale will collect on the paper and is
easily removed with the paper.
18
Figure #17
BLOCKED VENT
SAFETY SWITCH
HOLD DOWN
BOLT
BASE
ROLL-OUT SAFETY
SWITCH
GAS VALVE