Fig. 20 - - Monoport Burner
LIMIT SWITCHES
Normally closed limit switch (LS) completes the control circuit.
Should the leaving- -air temperature rise above the maximum
allowable temperature, the limit switch opens and the control circuit
"breaks." Any interruption in the control circuit instantly closes the
gas valve and stops gas flow to the burners and pilot. The blower
motor continues to run until LS resets. The furnace board STATUS
LED will display STATUS CODE 33.
When the air temperature at the limit switch drops to the
low- -temperature setting of the limit switch, the switch closes and
completes the control circuit. The direct- -spark ignition system
cycles and the unit returns to normal heating operation.
ROLLOUT SWITCH
The function of the rollout switch is to close the main gas valve in
the event of flame rollout. The switch is located above the main
burners. When the temperature at the rollout switch reaches the
maximum allowable temperature, the control circuit trips, closing
the gas valve and stopping gas flow to the burners. The indoor fan
motor (IFM) continues to run until switch is reset. The furnace board
STATUS LED will display STATUS CODE 33.
CONTINUOUS FAN MODE
When continuous fan operation is requested by the UI indoor fan
motor will operate at continuous blower airflow. Continuous fan
operation is programmable. See the UI Owner's Manual for detailed
instructions. Terminal EAC- -1 is energized as long as the indoor fan
motor is energized.
During a call for gas heat, the Infinity control will transition the
indoor fan motor to continuous blower airflow or gas heat airflow,
whichever is lowest. The indoor fan motor will remain ON until the
burners ignite, then shut OFF and remain OFF for the blower- -ON
delay allowing the heat exchangers to heat up more quickly, then
restarts at the end of the blower- -ON delay period.
The indoor fan motor will revert to continuous- -blower airflow after
the gas heating cycle is completed.
When the UI "calls for cooling", the indoor fan motor will switch to
operate at cooling airflow. When the call for cooling is satisfied, the
indoor fan motor will operate an additional 90 seconds at cooling
airflow before transitioning back to continuous- -blower airflow.
When the call for continuous fan is removed, the indoor blower will
continue operating for an additional 5 seconds before shutting
down, if no other function requires blower motor operation.
COMPONENT TEST
The Infinity Furnace Board features a gas component test system to
help diagnose a system problem in the case of a gas component
BURNER FLAME
BURNER
MANIFOLD
C99021
failure. To initiate the component test procedure, ensure that there
are no UI inputs to the control (the ABCD connector can be removed
from the Infinity control board for this operation) and all time delays
have expired. Turn on setup switch SW1- -6.
NOTE: The component test feature will not operate if the control is
receiving any UI signals or until all time delays have expired.
The component test sequence is as follows:
1. The control turns the inducer motor ON and keeps it ON
through step 3.
2. After waiting 10 seconds, the control turns the igniter ON for
15 seconds, then OFF.
3. The control then turns the indoor fan motor on for 15
seconds, then OFF.
4. After shutting the blower motor OFF, the control runs the
inducer for 10 seconds, then turns it OFF.
NOTE: The EAC terminals are energized when the blower is
operating.
After the component test is completed, one or more status codes (11,
25, or 41) will flash. See component test section or Status Code
Label for explanation of status codes.
NOTE: To repeat component test, turn setup switch SW1- -6 to OFF
and then back ON.
Step 3—Check for Refrigerant Leaks
Locate and repair refrigerant leaks and charge the unit as follows:
1. Use both high- - and low- -pressure ports to relieve system
pressure and reclaim remaining refrigerant.
2. Repair leak following accepted practices.
NOTE: Install a filter drier whenever the system has been opened
for repair.
3. Check system for leaks using an approved method.
4. Evacuate refrigerant system and reclaim refrigerant if no
additional leaks are found.
5. Charge unit with Puron (R- -410A) refrigerant, using a
volumetric- -charging cylinder or accurate scale. Refer to unit
rating plate for required charge.
Step 4—Start- -Up Adjustments
Complete the required procedures given in the Pre- -Start- -Up
section before starting the unit. Do not jumper any safety devices
when operating the unit. Do not operate the unit in cooling mode
when the outdoor temperature is below 40°F (unless low- -ambient
operation is enabled in the UI). Do not rapid cycle the compressor.
Allow 5 min. between "on" cycles to prevent compressor damage.
CHECKING
COOLING
OPERATION
See UI Installation Instructions for detailed system CHECKOUT.

CHECKING AND ADJUSTING REFRIGERANT CHARGE

The refrigerant system is fully charged with Puron (R- -410A)
refrigerant and is tested and factory sealed.
NOTE: Any adjustment to refrigerant charge must be done with
unit operating in HIGH stage.
NOTE: Adjustment of the refrigerant charge is not required unless
the unit is suspected of not having the proper R- -410A charge. The
charging label and the tables shown refer to system temperatures and
pressures in cooling mode only. A refrigerant charging label is
attached to the outside of the unit.