Installation Procedures; Overview - Andrew ES76PK-1 Installation, Operation And Maintenance Manual

Andrew operation manual 7.6-meter earth station antenna es76pk-1
Table of Contents

Advertisement

Installation Procedures

Overview

Foundation
Preparation
This section provides installation procedures for the 7.6-Meter Andrew Earth Station
Antenna. The installation procedures include instructions on the following antenna com-
ponents:
Mount
Reflector
Enclosure
Before beginning the installation process on the ground mount assembly, ensure that
the foundation has been prepared. Foundation specifications are provided by Andrew
and may be used as a reference by civil engineering personnel when preparing the
foundation for local soil conditions. These specifications are available before the ship-
ment arrives by contacting the Customer Service Center or your Account Manager.
Foundation should be dimensioned as detailed in Figure 1.
Sweep foundation clear of any dirt or debris.
To ensure smooth surface for mount, scrape foundation pad.
Studs should extend 6 in. (152mm) above the ground and are 1-1/4 in.(32mm) diame-
ter
Apply Stick Wax (200852) to stud threads to ease later connections.
Reflector-to-Mount Assembly
Subreflector
Figure 1
10
Installation Procedures

Advertisement

Table of Contents
loading

Table of Contents