Navien NCB-180 Installation & Operation Manual page 28

Combination boiler
Hide thumbs Also See for NCB-180:
Table of Contents

Advertisement

Follow the installation instructions included with the air removal
device when placing it in the system; air removal devices generally
work better when placed higher in the system. Always locate air
removal devices in areas of the system that have a guaranteed
positive pressure, e.g., in close proximity to the water fill and
expansion tank.
The Navien NCB boilers have a built-in air vent on top
Note
of the internal circulator to purge air from the boiler
system.
Expansion Tank
The expansion tank must be sized in accordance with the water
volume of the system as well as the firing rate of the appliance. It
is important to locate the expansion tank, and make-up water fill,
on the inlet side of any circulator in the system, as doing so will
guarantee the lowest pressure in the system will be at least equal
to the tank and make-up water pressure.
Ensure the expansion tank cannot become isolated from the
boiler anytime the system is operating. Failure to follow these
instructions may lead to discharge from the pressure relief valve,
which may result in property damage or injury.
The installation of flow checks, motorized valves or
Note
other shutoff devices (other than for the purpose of
servicing) are not permitted between the location of
the "Closely Spaced Tees" and the expansion tank.
Air Handler Interface
The Navien NCB boiler can control the operation of an air
handler when a thermostat is used in combination with the air
handling unit. The Air Handler Interface is designed to stop air
handler operation when the boiler's space heating function is not
operating due to DHW supply demands, boiler errors, or low water
conditions.
The air handler contacts (A/H) turn off when the following
conditions arise:
The PCB DIP SW2 #7 is set to ON.
Thermostat is turned off.
The boiler is supplying DHW, or it is in stand-by mode for DHW
demand.
Level 2 Errors, or higher level errors occur.
The boiler is turned off.
Make-up water auto-feeding is in progress.
Thermostat Configuration for the Air Handler Interface
Set the PCB DIP SW2 #7 to down position (OFF) to use a thermostat
with the Air Handler.
ON
1
2
3
4
5
6
Refer to the following diagram for wiring connections.
<Air Handler>
CN23
Thermostat
WARNING
The boiler, when used in conjunction with a refrigeration
system, must be installed so that the chilled medium is
piped in parallel with the heating boiler. Appropriate valves
must be used to prevent the chilled medium from entering
the boiler.
If the boiler is connected to heating coils located in air
handling units where they can be exposed to refrigerated
air, use flow control valves or other automatic means to
prevent gravity circulation of the boiler water during the
cooling cycle.
ON
1
2
3
4
5
6
7
8
<NCB>
CN10
CN24
CN25
Common
Hot
Installing the System Piping
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncb-210Ncb-240

Table of Contents