Following are the steps involved for Alignment:
i) Verify isolation between Bridge A and B:
Establish Link1 and align the antennas (Bridge A is the root bridge C is non-root)
Install Bridge B at least 10 feet away and configure as non-root and let it associate to bridge
A.
Measure RSSI voltage and make sure it is less than 2 V (-40 dBm), if not move bridge B
further away
ii) Verify isolation between Bridge A and D:
Install Bridge D at least 10 feet away from Bridge C and align it to associate bridge A.
Measure RSSI voltage and make sure it is less than 2 V (-40 dBm), if not reduce the power
on all bridges to 12 dBm, if RSSI is still larger alternate polarization of link 2
iii) Verify Isolation between Bridge C and D:
Shut down bridge A, configure bridge C as root then let Bridge D associate to it
Measure RSSI voltage and make sure it is less than 2 V (-40 dBm), if not move bridge D
further away
Note: The isolation between Bridge C and B is symmetrical to the isolation between A
and D
iv) Configure link1:
Re-establish link1 by configuring the root (A) and non-root (C) bridges accordingly
Set the channel on bridge A 5745 MHz or 5765 MHz
Align bridge A and C by maximizing the RSSI
v) Configure link2:
Copyright © 2004 Cisco Systems, Inc. All rights reserved.
Page 49 of 53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1400 series

Table of Contents