Zte -J G730 User Manual page 20

Zte-j gota digital mobile phone
Table of Contents

Advertisement

ZTE-J G730/G740/G750/G780 GoTa Digital Mobile Phone User Manual
For maximum battery performance, it is recommended that you
charge the battery for eight hours for the first three times. A new
battery's full performance is achieved only after three complete
charging and discharging cycles.
Warning:
• Put the phone at a ventilated place with temperature between +
5℃ and + 40℃. Use only the supplied or approved chargers.
Using unauthorized charger may cause danger and violate the
authorization and warranty rules of the phone.
• Charge the battery in time when your phone automatically powers
off or displays a warning "Battery low".
• Do not charge the battery more than 24 hours continuously.
• The talk time and standby time of the phone lie on ideal working
environments. In practice, the battery working time varies with
different network conditions, working environments and modes.
1. Insert the phone or battery into the charger compartments.
2. Connect the charger to an appropriate electrical outlet. The red
light on the charger will turn on.
When the charging is completed, the indicating light will turn to
green. Normally, during the charging process, your phone, battery
and charger may become hot.
Disconnect the charger with the phone, battery and power outlet
after charging.
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zte-j g750Zte-j g740Zte-j g780

Table of Contents