Assembly - Fisher-Price GeoTrax Instructions Manual

Tracktown railway
Hide thumbs Also See for GeoTrax:
Table of Contents

Advertisement

Assembly

1
COAL CHUTE
COAL MINE
ARCH
2
DEPOT
BASE
"Snap" the tabs on the depot
into the slots in the depot base.
COAL CHUTE
FRAME
DEPOT
COAL MINE
BUILDING
• "Snap" the posts on the
coal chute frame into
the holes in the coal
mine building.
• "Snap" the pegs on the
coal mine arch onto
the coal chute frame.
• Fit the coal chute into
the coal chute frame.
3
PIPE
WORKS
PIPE WORKS
BASE
"Snap" the tabs on the pipe works
into the slots in the pipe works base.
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Geotrax tracktown railway b1836

Table of Contents