Download Print this page

QC Home 3JPS012WHI Installation Manual And User's Manual

Contempory oval tub

Advertisement

Quick Links

Contempory
Oval Tub
Installation Guide
and User Manual
Model#: 3JPS012WHI
ATTENTION:
1.
Your installation must comply with all local plumbing building
codes. Have a qualified tradesman do or approve your plumbing
installation.
2.
Always wear safety goggles and gloves in order to avoid
personal injury.
3.
Please read and save this guide before using this product. Store
the guide in a safe place so you will know where it is when you
want to refer to it.

Advertisement

loading

Summary of Contents for QC Home 3JPS012WHI

  • Page 1 Contempory Oval Tub Installation Guide and User Manual Model#: 3JPS012WHI ATTENTION: Your installation must comply with all local plumbing building codes. Have a qualified tradesman do or approve your plumbing installation. Always wear safety goggles and gloves in order to avoid personal injury.
  • Page 2: Product Features

    IMPORTANT Carefully check the unit prior to installation to ensure there is no damage. Do not dispose of any packaging until you are satisfied with this product. If you have any problems with this product or there are missing or damaged parts, please call toll free: 1-800-459-4409 DO NOT RETURN THE UNIT TO THE PLACE OF PURCHASE...
  • Page 3: Before You Start

    BEFORE YOU START 1. Inspect your unit before proceeding. Check surface for any flaws or damage. Once you unpack your unit, check for chips, scratches, cracks, dents or scuff marks. If any damage is noticed, do not install. 2. Please read instructions carefully and keep for future reference. 3. Protect the entire surface during installation.
  • Page 4 CONTENTS Acrylic tub x 1 Access door screw x 4 Access door x 1 Leveling legs x 4 Illustrations may vary from actual product...
  • Page 5: Installation Instructions

    INSTALLATION INSTRUCTIONS NOTE: A thorough inspection must be made at the time of pick up or delivery. If the unit is damaged, do not install. The installation of this tub requires 2 people. 1. Carefully unpack the tub and contents from the packaging. 2. Inspect all areas of the tub and parts to ensure there is no damage.
  • Page 6 6. Install the main drain/overflow assembly onto the floor drain [not supplied]. 7. Carefully right the tub and move into its final location. Using a non-permanent marker, trace the lower perimeter of the tub below the access panel area. Fig.3. Fig. 3 8. Check the unit for level by placing a carpenters level across the width of the tub, and along the deck area to check in the other direction. Estimate from this, the changes required to the leveling feet. Move tub to an accessible area to allow you to adjust the levelling feet.
  • Page 7: Cleaning And Maintenance

    Fig. 4 12. Attach the hot and cold water supply lines [not supplied]. 13. Test the entire system for any leakage by filling the tub with water, and then draining it. Once no leaks are detected, install the access panel cover using the screws provided. CLEANING AND MAINTENANCE To maintain the smooth, high gloss surface of your bathtub, follow these tips: • Use common household cleaners (non-abrasive) or a mild liquid dish washing detergent.
  • Page 8 F IVE Y EAR G U AR AN TE E This unit is warranted to the original purchaser to be free of defects in material and workman- ship for five (5) years from the date of purchase. This warranty does not extend to commercial or institutional use or installation.