Pendant Mount Installation
1.
According to diameter and position of the
4 holes on the pole (as shown below), drill
3 holes on the ceiling or cement roof.
2.
Fix the upper pole brackets onto the wall
or cement roof tightly with 4 screws which
are prepared by you.
3.
Use 2 screws to fix the upper pole and
lower pole. The length is adjustable
ranging from 350mm~600mm.
4.
Use screws to fix camera on the lower
pole. Make sure the camera is tightly fixed
onto the bracket before your hands leave
the camera.
15