Friedrich SH15 Installation & Operation Manual page 14

230-volt hazardous duty room air conditioner
Table of Contents

Advertisement

Figure L
CAULK ALL SIDES
WEATHER CABINET
Figure M
Figure N
14
WEATHER CABINET
CAULK ALL SIDES
CAULK ALL SIDES
CABINET
MORTAR
SHIM THE VOID SPACE AT THE TOP AND
SIDES WITH WOOD AS REQUIRED
SHIM VOID SPACES AT TOP AND
SIDES WITH WOOD AS REQUIRED
FRAME WALL
CONSTRUCTION
BRICK VENEER
CONSTRUCTION
SOLID MASONRY
CONSTRUCTION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh20

Table of Contents