Savio Installation & Operation Instructions page 18

Wall hung gas boiler for central heating supply
Table of Contents

Advertisement

9. Venting Cont.
B
Standard separate horizontal ue kit (Exhaust & intake outside)
Various twin (split) pipes kits and optional accessories (elbows) are available to assist
in the termination of the ue where the boiler is installed in a location remote to an
outside wall. These kits allow for separation of the air supply pipe from the pipe that
discharges the exhaust gasses. Consequently it is possible to extend the ue system to
a greater distance than that provided by the standard coaxial horizontal ue.
If either an additional 45° or 90° accessory elbow is used then the maximum permis-
sible lenght of either pipe must be reduced by 3.0 ft or 5.4 ft respectively. The sum of
the lenghts of the two horizontal part must be less than 131 ft.
Installation:
Drill holes B & C (on the wall template) through the outside wall.
Cut the pipes as necessary so that no more than 6" of intake pipe protrudes from the
house and the exhaust pipe is a minimum of 4 inches longer than the intake pipe.
Slide the Intake and exhaust pipes through the respective holes.
Slide one rubber wall trim piece on each pipe from inside and one from outside.
Attach each collar to the boiler with the gasket and screws provided.
Insert each elbow into its corresponding collar.
Connect each pipe to its corresponding elbow (as shown in the diagram).
Secure end cap on the intake and exhaust pipe outside the house.
18 SAVIO HEAT ONLY MANUAL
Figure 9.3
(Twin pipe
φ 3.15 in)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heat only

Table of Contents