Q7C3 LCD Monitor Service Guide
B) Drop Sequence
1. Top
Surface
2. Front
3. Bottom
4. Rear
5. Right
6. Left
at weakness side [the low left(or right) corner of the front panel]
-An edge drop with impact on the shortest edge radiating from corner 5-3-2
-An edge drop with impact on the next shortest edge radiating from corner 5-3-2
-An edge drop with impact on the longest edge radiating from corner 5-3-2
-A flat drop with impact on the rear
-A flat drop with impact on the front
-A flat drop with impact on the right
-A flat drop with impact on the left
-A flat drop with impact on the bottom
-A flat drop with impact on the top
After test, there is no electrical and mechanical damage permitted.
2.2.3 Vibration Test (Unpackaged, Non-Operating)
5~200Hz at 1.04g rms
FREQUENCY (Hz)
DURATION: 15 MINUTES PER AXIS.
2.2.4 HALF-SINE SHOCK
Test conditions:
Test unit : 2 sets
Each unit has to withstand 18 shocks.(3 shocks pre face)
No- operation
Half-sine wave
Duration : 3ms
Acceleration(G) : 75G
2.3 Packing Configuration
2.3.1 Container Specification
a. Shipping Container
Manufacturing
joint
SPECTRUM LEVEL (g
2.0
4.0
8.0
40.0
55.0
70.0
200.0
2
5
2
/Hz)
0.0185
0.0300
0.0300
0.0030
0.0100
0.0100
0.0010
Engineering Specification
6
1
4
3
-Corner 5-3-2 select
6