Refrigerant Cycle Diagram - Toshiba RAS-18SKV-E Service Manual

Split type air conditioner
Hide thumbs Also See for RAS-18SKV-E:
Table of Contents

Advertisement

7-1. Refrigerant Cycle Diagram

RAS-18SKV-E / RAS-18SAV-E
RAS-18SKVR-E / RAS-18SAV-E
P
Pressure measurement
Gauge attaching port
Vacuum pump connecting port
Deoxidized copper pipe
Outer dia. : 12.7mm
Thickness : 0.8mm
4-way valve
(STF-0108Z)
Accumulater
tank
NOTE :
• The maximum pipe length of this air conditioner is 20 m. When the pipe length exceeds 15m, the additional
charging of refrigerant, 20g per 1m for the part of pipe exceeded 15m is required. (Max. 100g)
7. REFRIGERANT CYCLE DIAGRAM
INDOOR UNIT
Indoor heat
exchanger
Cross flow fan
Deoxidized copper pipe
Outer dia. : 6.35mm
Thickness : 0.8mm
Sectional shape
of heat insulator
Muffler
Muffler
TD
Compressor
DA130A1F-27F
TS
Outdoor heat
exchanger
Propeller fan
OUTDOOR UNIT
Temp. measurement
T1
TC
TA
TO
TO
Split capillary
2 - Dia1.2 x 80
DISTRIBUTOR
TE
NOTE :
– 20 –
Max.
Min.
Chargeless : 15m
Charge : 20g/m
(16 to 20m)
Strainer
Pulse Modulating
valve at liquid side
(CAM-B22YGTF-3)
Refrigerant amount : 1.40kg
Gas leak check position
Refrigerant flow (Cooling)
Refrigerant flow (Heating)
: 20m
: 2m

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents