Set Up Of Service P.c. Board - Toshiba RAS-B10SKVP-E Service Manual

Split type air conditioner
Hide thumbs Also See for RAS-B10SKVP-E:
Table of Contents

Advertisement

Before replacing the P .C. board, set up the P .C. board according to the following table.
When repaired P.C. board should be electric discharge of capacitor. (C12, C13, C14)
Caution
APPLICATION MODELS :
RAS-10SAVP-E, RAS-13SAVP-E, RAS-16SAVP-E
RAS-10SAVP-ND, RAS-13SAVP-ND, RAS-16SAVP-ND
JUMPER SET UP :
As shown in the following table, cut jumper lead wire (J800, J801, J802, J806) according to each model.
Corresponding
ORIGINAL
model
Jumper lead wire
J800
Jumper lead wire
J801
Jumper lead wire
J802
Jumper lead wire
J806
LOCATION OF JUMPER LEAD WIRE :

14. SET UP OF SERVICE P.C. BOARD

RAS-
10SAVP-E
Close
Close
(Original)
(Original)
Close
Close
(Original)
(Original)
Close
Close
(Original)
(Original)
Close
Close
(Original)
(Original)
J800, J801, J802
MCC-5009
C12
RAS-
RAS-
13SAVP-E
16SAVP-E
Close
Open
(Original)
(Cut)
Open
Close
(Cut)
(Original)
Close
Close
(Original)
(Original)
Close
Close
(Original)
(Original)
IC800
L01
C13
C14
– 118 –
RAS-
RAS-
10SAVP-ND 13SAVP-ND 16SAVP-ND
Open
Close
(Cut)
(Original)
Open
Close
(Cut)
(Original)
Close
Open
(Original)
(Cut)
Close
Close
(Original)
(Original)
J806
Capacitor
RAS-
Close
(Original)
Open
(Cut)
Close
(Original)
Close
(Original)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents