Miele G 4700 Operating Instructions Manual page 49

Hide thumbs Also See for G 4700:
Table of Contents

Advertisement

If optimise standby is switched on
(see "Programme options, Optimise
standby") the display will go out after
a few minutes, leaving just the Start
indicator flashing slowly.
Press any button to switch the display
back on again for a few minutes.
The time up until the programme starts
will show counting up in the display in
hours for durations above 10 hours,
and in minutes for durations below this.
When the set time is reached, the pro‐
gramme selected will start automatical‐
ly. The time remaining will appear in the
display and the  indicator light will go
out.
How the Delay start time is shown in
the display:
up to 59 minutes:
e.g. 30 minutes = .
1 hour up to 9 hours 30 minutes:
e.g. 5 hours = .
over 10 hours:
e.g. 15 hours = 
Programme options
Starting a programme before the De‐
lay start period has elapsed:
A programme can be started before the
Delay start period has elapsed.
Proceed as follows:
 Switch the dishwasher off with the 
button.
 Switch the dishwasher on again with
the  button.
 Select the programme you want.
 Press the Start button.
The programme will begin and the Start
indicator light will light up.
49

Advertisement

Table of Contents
loading

Table of Contents