RAPID-SORB

Vertical Duct Installation

Install the RAPID-SORB with dispersion tubes and
header pitched to condensate drain as shown in figures
14-1,14-2, and 14-3.
See "Instructions for Horizontal Duct" for additional
information on page 13, as applicable.
Figure 14-1: Plan View
Steam
Supply
Figure 14-3: Elevation View Tube with Drain
DN 0 (¾")
Coupling
15 mm
Min.
15 mm Min
150 mm
Min.
Open Drain
14
ASSEMBLy AND INSTALLATION
®
Drain
10 mm/m pitch
minimum
Airflow
Recommended 10 mm/m
pitch minimum
.
DN 8 (¼")
Condensate
Drain
Piping by others
Figure 14-2: Elevation View Tube without Drain
150 mm Min.
15 mm Min.
Table 14-1*: Maximum Steam Carrying Capacity in kg/h
Vapor Hose
Developed Length
Hose I.D.
of 3.0 Meters**
40 mm
68 kg
50 mm
115 kg
* Based on total pressure drop in piping/hose of 15 Pa.
** For developed length add 50% to measured length for pipe fittings.
Note: To minimize loss of humidifier capacity and efficiency, it is recommended that tubing/piping be
installed.
Airflow
Recommended
165 mm/m pitch
Copper or Stainless Steel Tubing and
Schedule 40 Steel Pipe
Tube or
Base on Developed
Pipe Size
Length of 6 Meters**
40 mm
68 kg/h
50 mm
100 kg/h
75 mm
205 kg/h
100 mm
340 kg/h
125 mm
635 kg/h
150 mm
1043 kg/h