Rapid-Sorb Assembly And Installation; Horizontal Duct Installation - VAPORSTREAM VLC Installation Instructions And Maintenance Operations Manual

Electric steam humidifiers
Table of Contents

Advertisement

Instructions for Horizontal Duct
1. Unpack shipment and verify receipt of all
RAPID-SORB components with packing list. Report
any shortages to the DRI-STEEM factory immediately.
2. Provide necessary access in and around duct work.
3. Locate 1" x 1½" (25 mm x 38 mm) stainless steel
channel inside the duct. Hang the channel from the top of
the duct, centered between duct side walls, with the two
mounting holes provided.
4. If hose cuffs are used, slide cuffs over the open end of
each tube. Install a pair of hose clamps on each tube.
5. Note direction of air flow within duct, then arrange each
dispersion tube so steam will discharge perpendicular to
the air flow. Use the hex bolts provided to attach tubes to
overhead 1" x 1½" (25 mm x 38 mm) channel. Do not
secure. If the header is outside the duct (see figure 13-2),
punch-out necessary clearance holes in the base of the
duct to slide dispersion tubes up from bottom.
6. For a Header Inside the Duct (See figure 13-1.):
Punch or cut out necessary clearance holes for
RAPID-SORB header. Slide header into the duct, position
header and slide the dispersion tube hose cuffs or slip
couplings over the header dispersion tube nipples.
Position the header so vertical dispersion tubes are
perpendicular to duct and pitch the header to condensate
drain. Secure header to the mounting bracket. Use
escutcheon plates to secure header where it enters the
duct.
Figure 13-1: RAPID-SORB Unit
Header Inside Duct
Dispersion Tube
Orificed
Tubelets
Slip
Coupling or
Hose Cuff
Pitch 1/8" per foot (10 mm/m) minimum
Header
Optional Companion
Flange or Threaded
Connection for Hard Piping
OM-101
®
RAPID-SORB
ASSEMBLY AND INSTALLATION
1" x 1-1/2" (25 mm x 38 mm)
S.S.T. Channel (by DRI-STEEM)
Condensate
Drain,3/4" NPT
3/4" (20 mm)Copper
Air Gap
*Open Drain
* Refer to local codes for drain pipe size requirements.
Check that the dispersion tubes discharge steam perpen-
dicular to the air flow. Secure tubes to the overhead
channel. Secure the channel to the duct. Position hose
cuffs or slip couplings over tube and header tube nipples,
and secure with clamps.
For a Header Outside the Duct (See figure 13-2.):
Position header under dispersion tubes, then slide hose
cuffs or slip couplings over header dispersion tube nipples.
Position the header so dispersion tubes are perpendicular
to duct and pitch the header to condensate drain. Secure
dispersion tubes in place with the tube escutcheon plates
provided.
Check the position of the tubes for steam release perpen-
dicular to the air flow. Secure tubes to the overhead
channel, and secure channel to the duct. With header
pitched to condensate drain, slip hose cuffs or slip
couplings over tube nipples and secure with clamps.
7. Connect a condensate drain to the header, provide the
water trap as shown, and run to open drain, sized accord-
ing to local codes.
8. Attach the header steam supply connector to main
header using the hose cuff and clamps provided, but do
not secure.
9. Route the necessary number of vapor hoses or pipes
from the humidifier tank, position connector to accept the
hoses or pipes and secure.
Note: Refer to page 15 for vapor hose information on
routing and for alternate vapor hose installation methods.
Figure 13-2: RAPID-SORB Unit
Header Under Duct
Top of
Duct
or Casing
View A-A
Mounting
Channel
Duct or
Casing
3/8-16 x ½"
Hex Head
Slip Coupling
Nut and
Bolt
or Hose Cuff
Bolt
6"
(150
mm)
Min.
5"
(125
mm)
Min.
1" x 1-1/2" (25 mm x 38 mm)
S.S.T.Channel (by DRI-STEEM)
Dispersion
A
Tube
Orificed
Tubelets
A
Pitch 1/8"
Condensate
per foot
Drain, 3/4" NPT
(10 mm/m)
Hose Cuff
3/4" (20 mm)
minimum
and Clamps
Copper
®
VAPORSTREAM
Model
VLC Humidifier
Duct
Escutcheon
Plate
Mounting
Nut
6" (150
mm) Min.
5"
(125
Air Gap
mm)
Min.
*Open Drain
OM-102
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

VldiVldi

Table of Contents