Water Piping And Trim - New Yorker FR SERIES Installation, Operating And Service Instructions

Fr series horizontal tube boiler
Table of Contents

Advertisement

III. Water Piping and Trim
F
i a
u l
e r
o t
p
o r
p
r e
y l
p
O
x
y
g
e
n
c
o
n
a t
m
n i
t a
o i
c
a
n
e l
a
d
o t
b
o
l i
r e
a f
o
x
y
g
e
n
c
o
n
a t
m
n i
t a
o i
A.
DESIGN A PIPING SYSTEM and install boiler which
will prevent oxygen contamination of boiler water and
frequent water additions.
1. There are many possible causes of oxygen
contamination such as:
a. Addition of excessive make-up water as a result
of system leaks.
b. Absorption through open tanks and fittings.
c. Oxygen permeable materials in the distribution
system.
2. In order to insure long product life, oxygen sources
should be eliminated. This can be accomplished by
taking the following measures:
a. Repairing system leaks to eliminate the need for
addition of make-up water.
b. Eliminating open tanks from the system.
c. Eliminating and/or repairing fittings which allow
oxygen absorption.
d. Use of non-permeable materials in the
distribution system.
e. Isolating the boiler from the system water by
installing a heat exchanger.
N
S
y
s
e t
m
s
u
p
p
y l
a
n
c
o
n
n
e
c
e t
d
o t
c
r o
e r
N
e
w
Y
o
k r
r e
e r
c
o
m
s
y
s
e t
m
i c
c r
l u
t a
r o
f
o l
w
(
G
P
M
)
o t
l a
o l
d
f i
e f
e r
n
i t
l a
n i
h t
e
h t
e
s
y
s
e t
m
i c
c r
u
a l
f o
a
l l
a r
i d
t a
r o
, s
b
a
u t
b
n i
g
a
n
d
a
l l
c
o
n
c
o
n
s
d i
e
e r
. d
3. Connect System supply and return piping to
boiler. See Figures 5 and 6. Also, consult
I=B=R Installation and Piping Guides. Maintain
minimum ½ inch clearance from hot water piping to
combustible materials.
10
p i
e
b
o
l i
r e
m
a
y
e r
s
u
t l
n
f o
b
o
l i
r e
w
t a
r e
w
l l i
l i
r u
. e
N
e
w
Y
o
k r
r e
s '
S
n
f o
b
o
l i
r e
w
t a
r e
r o
O
T
C I
E
d
e r
u t
n r
p
p i
n i
g
m
u
t s
t c
b
o
l i
r e
p
p i
. e
m
e
n
d
s
s
z i
n i
g
h t
e
o t
s
u
p
p
y l
s
u
f f
c i
e i
t n
w
a
2
0
F °
e t
m
p
e
a r
u t
e r
s
y
s
e t
m
.
W
h
e
n
s
z i
n i
g
o t
, r
h t
e
p
e r
s
s
u
e r
d
o r
s
e
b
o
a
d r
a
n
d
a r
d
a i
t n
n
e
t c
n i
g
p
p i
n i
g
m
u
t s
W
A
R
N
N I
G
n i
i
m
p
o r
p
r e
o
p
r e
t a
o i
N
O
T
C I
E
c
a
u
s
e
c
r o
o r
s
o i
n
o
i f
a t
n
d
a
d r
W
r a
a r
n
y t
d
o
s
c
a
e l
i l (
m
) e
b
i u
d l
u -
p
a. If this boiler is used in connection with
Figure 4: Recommended Piping for Combination
Heating and Cooling (Refrigeration) System
b. If this boiler is connected to heating coils located
b
e
c. If boiler is used with an Indirect-Fired Domestic
p
b
e
d. Use a system bypass if the boiler is to be
n
a
n
d
d
a
m
a
g
e
o t
b
o
l i
o r
n
a
n
d
s
e t
l e
b
o
l i
r e
e
s
n
t o
c
o
v
r e
p
o r
b
e l
m
c
a
u
s
e
d
b
y
f
e r
q
u
e
t n
a
refrigeration systems, the boiler must be installed
so that the chilled medium is piped in parallel
with the heating boiler using appropriate valves
to prevent the chilled medium from entering
the boiler. See Figure 4. Also, consult I=B=R
Installation and Piping Guides.
in air handling units where they may be exposed
to refrigerated air, the boiler piping must be
equipped with flow control valves to prevent
gravity circulation of boiler water during the
operation of the cooling system.
Hot Water Heater, install the Indirect-Fired
Domestic Hot Water Heater as a separate heating
zone. Refer to the Indirect-Fired Domestic Hot
Water Heater Installation, Operating, and Service
Instructions for additional information.
operated in a system which has a large volume
or excessive radiation where low boiler water
temperatures may be encountered (i.e. converted
gravity circulation system, etc.) The bypass
r e
r o
t s
u r
t c
r u
. e
c
o
m
p
o
n
e
t n
, s
a
n
d
s
c
a
u
s
e
d
b
y
d
d
t i
o i
n
f o
w
a
e t
. r

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents