Daewoo DVN-14F6N Service Manual page 16

Daewoo tv vcr combo service manual
Table of Contents

Advertisement

Fig. 16- Loading Lever Ass'y Disassembly
NOTE :
Reassemble the cassette loading mechanism using the
reverse procedures. Confirm that the two (2) bosses on the
left side of the cassette holder are inserted into the groove
in the left side of the top plate. Insert the two (2) bosses on
the right side into the F/L bracket R (Fig. 17)
Fig. 17- F/L Brkt R
Replacement of the Drum Assembly/Earth
Bracket
(fig. 18)
1. Remove three (3) screw (3).
2. Remove the earth bracket (5).
3. Carefully lift drum assembly (4) from the deck mecha-
nism taking care not to damage or touch the video
heads.
NOTE :
After reassembling the assembly, confirm that the tape runs
smoothly and confirm all tape path adjustment procdures in
the "Mechanical Adjustment" section of this service publica-
tion.
Fig. 18- Replacement of the Drum total Ass'y and Earth Brkt Ass'y
Reel belt, Loading Rack, Loading Gears, and
S/T Slant Pole Removal
1. Turn the Deck Mechanism upside down and remove the
reel belt.
2. Remove one (1) poly washer
rack (2).
3. Remove Right and left loading gears
4. Remove the S and T slant poles
them in the direction of the arrow.
NOTE :
• Take care not to get grease on the guide rollers.
• When reinstalling, realign the gears as shown in Fig 20.
Fig. 19- Reel belt, Loading Rack, Loading Gears, S/T slant pole
Removal
13
(Fig. 19, 20)
and remove the loading
and
.
and
by pulling

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dvn-20f6n

Table of Contents