To Access Help Files; Startup Procedures - Allied Telesis Rapier 16fi Hardware Reference Manual

Rapier series
Hide thumbs Also See for Rapier 16fi:
Table of Contents

Advertisement

18

To access help files

To display a list of help topics, enter:
help
To display help on a specific topic, enter:
help topic
Alternatively, type a question mark (?) at the end of a partially completed
command to see a list of valid options.

Startup Procedures

When the switch starts up following either a power cycle or an operator-
initiated reboot (using the Reset button or RESTART command), a series of
start-up messages is sent to the RS-232 Terminal Port
Figure 17: Switch start-up messages
INFO: Self tests beginning.
INFO: RAM test beginning.
PASS: RAM test, 32768k bytes found.
INFO: BBR tests beginning.
PASS: BBR test, 128k bytes found.
INFO: Self tests complete
INFO: Downloading switch software.
Force EPROM download (Y) ?
INFO: Initial download succeeded
INFO: Executing configuration script <boot.cfg>
INFO: Switch startup complete
Manager >
After the self tests are complete, the manager is given the option of forcing a
mandatory boot from the EPROM release. The message:
Force EPROM download (Y)?
is displayed on the terminal connected to the RS-232 Terminal Port and the
switch pauses. If a key is not pressed within a few seconds, the start-up process
will continue and all steps in the sequence will be executed. Pressing selected
keys on the terminal immediately after the "Force EPROM download" message
is displayed will change the switch start-up process
Table 1: Switch start-up sequence keystrokes
Pressing key...
Forces the switch to...
[Y]
Load the EPROM release, with no patch.
[S]
Start with the default configuration. Any boot script is ignored.
[Ctrl/D]
Enter diagnostics mode.
Rapier Series Switch
(Figure
17).
(Table
1).
C613-03020-00 REV K

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rapier 24iRapier 48wRapier 48i

Table of Contents