Logic Voltage Check-Out Procedure; +12V Boost Power Supply; Location Of The Power Supplies - Pearson OpScan iNSIGHT 70 Installation Manual

Table of Contents

Advertisement

Logic Voltage Check-out Procedure

The outputs of the power supplies are read at their most critical point-the input to
the Camera Controller Board, the Solenoid Clutch Activation Board, and the Top
LED Mother Board.
Turn on the scanner power switch.
1.
Use a DVM to measure the outputs to the voltages listed in Table 2-4. Be sure
2.
to connect your ground probe to TPG1, TPG2, TPG3, or TPG4 on the Camera
Controller Board.
Table 2-4 Logic Voltages
Camera
Nominal
Controller Pin
Voltage
Location
+5V
J5 - 3
-15V
J5 - 1
+15V
J5 - 2
Ground
TPG1, TPG2,
TPG3, TPG4
+12.5V
+V Boost
+5V

+12V Boost Power Supply

There are no adjustments to the +12V, 200W boost power supply. If its output is
not +12.5V to 16V, replace the supply.

Location of the Power Supplies

Figure 2-1 and Figure 2-2 illustrate the location of the power supplies and the
location of the adjustment potentiometers. The power supplies that may require
checkout and periodic adjustments are:
+12V, 250W, Solenoid and DC Motors Power Supply (adjusted to +12.5V)
+5V LED Power Supply
+5V and ±15V Logic Power Supply
The Logic Power Supply is labeled ±12V, but it should be adjusted to ±15V.
Note:
Solenoid Clutch
Activation
Top LED
Board (SCAB
Mother Board
Pin Location
Pin Location
J9 - 4
J9 - 7
J3 - 1
Scanner Installation
Installing the Scanner
Acceptable Range
+4/95 to + 5.20V DC
-15 to - 15.20V DC
+15.0 to -15.20V DC
+12.5 to +13V
+12 to +16V
+5 to +5.5V
2-9

Advertisement

Table of Contents
loading

Table of Contents