Nokia N90 Service Manual page 19

Hide thumbs Also See for N90:
Table of Contents

Advertisement

nokia
C
P
ONNECTING
EOPLE
CMO Operations & Logistics
WW Service Solutions & Development
Bochum / Germany
17.) Release the flex foil connector of the Inner K2 LCD.
19.) Release the connectors from one side first.
21.) Bend the Hinge carefully to release the Display
Frame Moulding.
Service Manual n90 Level 1&2
PAGE 19 (29)
CONFIDENTIAL
18.) Now the LCD can be removed.
20.) Prevent scratching the PWB while releasing both
connectors.
22.) Take away the Display Frame Moulding.
Copyright © 2005 NOKIA Corporation. All rights reserved.
Approved 1.0
MGR
29.6.2005

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm-42

Table of Contents