Page 1
Assembling the new Mirage Drive drums and cables Caution: The new cables and drums are slotted for easier maintenance and tune ups. They are not interchangeable with the older parts. Warning: If cables are installed incorrectly, they may twist off the drums, causing the Drive to fail.
Page 2
link of chain with marking pen for easy placement). 2. Lightly grease drum axle Note: there are two methods of assembling the cables to the new drums -- on the bench (3 through 7 "A" below) or with the drive properly mounted in a bench vise (3 through 7 "B"...
Page 3
Vise method: 3 B. Secure Drive to vise by rear portion as shown. Use a rag in vise to prevent marks (rag removed for illustration purposes, right). 4 B. Mount both drum / crank arm assemblies to drum shaft, noting correct left and right side.
Page 4
8. (both methods) Tighten and tune all cables. Make sure they are running properly on the drums (below). Align and center fins as necessary. Troubleshooting: 1. Cable wanders off drum. Cable is twisted. Remount, removing twist or warping cable toward inboard side of drum. 2.
Need help?
Do you have a question about the V2 Drum and is the answer not in the manual?
Questions and answers