Electrical - Henny Penny BCC/BCR-140 Service Manual

Blast chiller/freezer
Hide thumbs Also See for BCC/BCR-140:
Table of Contents

Advertisement

Henny Penny
2-2. UNPACKING
(Continued)

2-3. ELECTRICAL

2-2
Model BCC/BCR-140, BCC/BCR-175, BFR/BCR-350
4.
Open door and remove packing from the inside of the unit.
5.
Peel off any protective covering from the exterior of the
cabinet.
6.
Your Blast Chiller is now ready for operation.
If the blast chiller has been laid on its side, the unit must be
sitting upright for at least an hour before applying power to
the unit. Check all components for signs of being loose or
damaged, and make sure the system has refrigerant. Failure
to follow these instructions may causedamage to the
components. Failure to follow these instructions could cause
damage to the compressor.
Be certain to save any literature that is packed inside the
cabinet, or separate boxes.
BCC-140
BCC-175
BCR-140 and 175
BFR and BCR-350
The data plate, located inside of the unit, will specify the correct
electrical supply. The unit requires a grounded receptacle with a
separate electrical line protected by a fuse or circuit breaker of the
proper rating.
The cabinet must be adequately and safely grounded
according to local electrical codes to prevent the possibil-
ity of electrical shock.
NOTE
• 200 V, 50-60 Hz, 3 phase
• 208-240 V, 60 Hz, 3 phase
• 230 V, 50 Hz., 1 phase
• 200 V, 50-60 Hz, 3 phase
• 208-240 V, 60 Hz, 3 phase
• 400 V, 50 Hz., 3N phase
• 208-240 V, 60 Hz, single phase
• 230 V, 50 Hz, single phase
• 200 V, 50-60 Hz., single phase
• 200 V, 50-60 Hz, 3 phase
• 208-240 V, 60 Hz, 3 phase
• 400 V, 50 Hz., 3N phase
201

Advertisement

Table of Contents
loading

Table of Contents