Recessed Mount Installation - Williams 6008532 Owner's Manual

Magnum forsaire counterflow top-vent gas wall furnace
Hide thumbs Also See for 6008532:
Table of Contents

Advertisement

Installing Your Furnace
FIGURE 7
Grilles Connecting Rooms to
Make Unconfined space
FOR EXAMPLE: Your furnace is rated at 60000 Btu/hr. The water
heater is rated at 30,000 Btu/hr. The total is 90,000 Btu/hr. You
need two grilles, each with 22½-square inches of free opening,
unless connected by horizontal ducts which would require each
grille or opening to have a free area of 45 square inches.

Recessed Mount Installation

FIND THE STUDS (See CAUTION on page 7)
Use a stud locator or small finishing nails. Repeatedly drive and
remove a nail into the wall in the area of the stud until it is located.
Then find the inside edge of the stud. Leave the nail at this
location.
The other stud should be about 14½-inches from the one found.
Drive finishing nails on the ins ide of this stud. Draw wall cutout to
required size as shown on Page 13, Fig. 13. If wall studs are not
on 16-inch centers see "CLOSE OFF STUD SPACE." (As shown
on Page 12, Fig. 12).
CUT WALL OPENING
Provide an opening as shown on Page 12, Fig. 10. Work from the
top in the attic to cut away the ceiling plate.
FIGURE 8
Air from Outdoors or Crawl
Space
*
Openings for inlet or outlet air should not be made into attic area
if attic is equipped with a thermostat controlled power vent.
FIGURE 9
Free Area
Btu/hr./Input
WARNING: BEFORE
electrical shock, turn off electrical circuits that pass
through the wall where you are going to install the
furnace.
ATTACH HEADER PLATE
MODELS: 6008531; 6008532
Locate header plate between wall studs at 81 3/4 inches from
finished floor and nail into position with end flanges pointing up.
Make sure header plate is level.
ALL MODELS
Hole or electrical conduit is located on left side of header plate as
you face the wall.
Btu/hr.
INSTALLING:
To avoid

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents