PRIMARY, MONITOR, & SECONDARY SWITCH
CHECKOUT PROCEDURE
Switch
Primary Interlock
Secondary Interlock
Monitor
Test Procedure
1. Disconnect wires from the primary
interlock switch.
2. Measure from COM terminal (white
wires) to N.O. terminal (blue wires).
1. Disconnect wires from the secondary
interlock switch.
2. Measure from COM terminal (white
& black wires) to N.O. terminal
(white wires).
3. Measure from COM terminal (white
& black wires) to N.C. terminal
(yellow wires).
1. Disconnect wires from the monitor
switch.
2. Measure from COM terminal (blue
wires) to N.O. terminal
(blue wires).
3. Measure from COM terminal (blue
wires) to N.C. terminal (red & white
wires).
- 16 -
Door
Door Open
Closed
No
Continuity
continuity
No
Continuity
continuity
Continuity
No
continuity
No
Continuity
continuity
Continuity
No
continuity