Download Print this page

GE DDC4400T5WH Installation Instructions page 2

Commercial stacked electric dryer

Advertisement

Installation
STEP 4 - Connect both dryers to power supply. (See
ELECTRICALCONNECTION INFORMATION section of this
instruction.)
STEP 5 - Connect both dryers to external exhaust. (See
EXHAUSTINFORMATION section of this instruction.)
STEP 6 - Hook both chains from upper unit to appropriate
wall hooks taking up any slack.
STEP7 - Adjust all 4 levelling legs. Dryer must be levelled and
rest firmly on all 4 levelling legs.
Instructions
,IDE VIEW
LEVELLING
LEGS
Alternate Method for Installation
of Wall Hooks
STEP1
If wall studs are not correctly spaced or centered behind upper
unit, it may be necessary to attach a horizontal 2" x 4" board to
the existing wall.
STEP2
Attach wall hooks in approximate position of two chains of upper
unit so each chain pulls straight buck to wall.
NOTE:If wall is concrete or block, drill holes and use appropriate
wall anchors. Thefinal construction must withstand u pull of 200
Ibs.
WA[_TUDS
LL. WA .,.ooKs
CONNECTING
DRYER USING 3-WIRE CONNECTION
, Remove the cover near the power cord entry hole.
, Install 3/4" UL recognized strain relief to power cord entry
hole. Bring power cord through strain relief.
, Connect two HOT lines to outer screws (L1 & L2) of terminal
block.
, Connect NEUTRAL(white)line to center screw (N) of
terminal block.
, Tighten all terminal block screws securely.
, Properly secure power supply cable to strain relief.
, Reinstall the cover.
Grounding:
,If local codes permit, be sure ground strap is connected
to neutral (centre terminal of block and to ground screw
on rear frame).
,If local codes do not permit frame of dryer to be grounded
to neutral, remove and discard groundstrap. The frame
must be grounded by attaching a ground wire (not
supplied) to the green grounding screw on rear of dryer
and to a grounded metal cold water pipe or other
established ground.
i ,_WARN,
N G: NEVER LEAVE THECOVER OFFi
OF THE TERMINAL BLOCK.
If required,by localcode,installexternal
ground (notprovided)to groundedmetal,
coldwater
pipe, or
other established
ground determined
by
a qualified
electrician.
Fuse
_
Screw
GreenGroundScrew_
_'
\
_
_[
&Ground Strap
_
"X_¢)
:_Z
Bracket
Hot
Wire
.,_X
Neutral
(white)
3/4" UL
Recognized
StrainRelief
3 #10 AWG minimum
copper conductors
or 120/240V 30A power supply
cord kit marked for use with dryers and provided with closed loop or
spade terminals
with upturned
ends (not supplied).

Advertisement

loading