Download Print this page

Haier HSU-09H03/K(F) Installation Manual page 2

Haier room air conditioner installation manual
Hide thumbs Also See for HSU-09H03/K(F):

Advertisement

To this unit, both liquid and gas pipes shall be insulated
as they become Iow temperature in operation.
Use optional parts for piping set or pipes covered with
equivalent insulation material.
Indoor unit
1.Fitting of the Mounting Plate and Positioning of the wall Hole
When the mounting plate is first fixed
1.Carry out, based on the neighboring pillars or lintels, a proper leveling for the plate to be
fixed against the wall, then temporarily fasten the plate with one steel nail.
2. Make sure once more the proper level of the plate, by hanging a thread with a weight from
the central top of the plate, then fasten securely the plate with the attachment steel nail.
3. Find the wall hole location A using a measuring tape
2.Making a Hole on the Wall and Fitting the Piping Hole Cover
Make a hole of 60 mm in diameter,
slightly descending to outside the wall.
Install piping hole cover and seal it
off with putty after installation
Floor fixing dimensions
of the outdoor unit
(Unit:mm)
HSU-09H03/K(F)
HSU-12H03/K(F)
HSU-12C03/K(F)
Selection of pipe
Liquid pipe (
Gas pipe (
Indoor side
Wall hole
66mm
(Section of wall hole)
2
For 09k
)
6.35mm(1/4")
6.35mm(1/4")
)
12.7mm(1/2")
9.52mm(3/8")
B= 66mm
A=210mm
Outdoor side
G
Piping hole pipe
For 12k
Thickness
of wall

Advertisement

loading