Prepare Air Conditioner For Installation - Haier CWH08A Use And Care Manual

Haier air conditioner user manual
Hide thumbs Also See for CWH08A:
Table of Contents

Advertisement

Available languages

Available languages

Install Side Curtains
NOTE: Attach curtains to the air conditioner before placing the air
conditioner in window.
1. Locate provided bag of screws.
2. Insert top and then bottom of right-hand curtain housing in
top and bottom curtain channels on air conditioner.
Back View
A
A. Curtain housing
B. Curtain top channel on air conditioner
Bottom View
A
A. Curtain housing
B. Curtain bottom channel on air conditioner
6

Prepare Air Conditioner for Installation

B
B
3. Extend right-hand curtain outward so you may insert a
screw through the top hole in the curtain. Using a
screw curtain to the top hole in the air conditioner cabinet.
NOTE: This screw is required to correctly attach curtain (top
to bottom) to the air conditioner cabinet.
Front View
4. While the right-hand curtain is still extended, insert
through the other two holes in the curtain. Screw curtain to
all three holes in the air conditioner cabinet.
5. Slide the curtain housing into the channels as far as it will go.
6. Repeat above steps for the left-hand curtain.
"
" screw,
" screws

Advertisement

Table of Contents
loading

Table of Contents