Receiving & Installation; Section 3 Receiving & Installation; Receiving & Inspection; Lifting The Generator - Baldor DG3E Installation & Operating Manual

Diesel pow’r products generator
Hide thumbs Also See for DG3E:
Table of Contents

Advertisement

Section 3
Receiving & Installation
Receiving & Inspection

Lifting the Generator

When lift or hoist equipment is used to lift the generator and move it to position, be careful not to
contact overhead wires or other obstacles. The generator weighs between 100 and 350 lbs.
Use proper lift equipment and methods to avoid injury. Lift only by the tubular metal frame.

Storage

If you will not be using the generator set for a significant amount of time (3 months or longer) you
should store the generator to prevent any problems that could arise from sitting idle. Please fully
read the following guidelines prior to storing the unit.
Note: Do not let the fuel tank run completely empty. Unlike gas engines, diesel engines must be
WARNING: Never store an engine with fuel in its tank indoors or in an enclosed, poorly ventilated area
where diesel fumes could reach an ignition source and cause an explosion.
MN2414
When you receive your generator, there are several things you should do immediately.
1.
Observe the condition of the shipping container and report any damage immediately to
the commercial carrier that delivered your system.
2.
Verify that the part number of the system you received is the same as the part number
listed on your purchase order.
3.
If the system is to be stored for several weeks before use, be sure that it is stored in a
location that conforms to published storage temperature and humidity specifications.
Figure 3-1 DG Series Generators
1.
Close all the fuel valves.
primed to remove air from the fuel lines.
2.
Disconnect and remove the battery if your generator set is so equipped.
3.
Drain the used oil from the engine's crankcase and refill it with clean oil.
4.
Provide maintenance to the engine and generator set as described in the engine and
generator maintenance sections of this manual.
5.
Cover any bare metal spots with paint or another type of rust preventative.
Receiving & Installation 3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dg6e

Table of Contents