General Description Of The Water / Steam Dispenser; General Overview; Installation And Start-Up; Prior To Installation - Quality Espresso Water/Steam Dispenser User Manual

Water/steam dispenser
Table of Contents

Advertisement

General Description of the Water / Steam Dispenser

2.

2.1 General Overview

1
12
11
10
9
i
Verify the level indicator and empty the tray if
necessary.
the drain tray, without being externally connected to a
general drain. For this reason they incorporate a level
indicator.
1 - Hot Water Tap
2 - Steam Tap
3 - Steam arm protector
4 - Boiler level light
3.

Installation and Start-up

3.1 Prior to Installation

Verify before Installing:
1. Water supply tube (supplied with machine)
from network to water softener.
2. Stopcock with 3/8" G exit.
3. Grounded plug protected with a magneto-
thermic circuit breaker.
4. Water supply tube (supplied with machine)
from water softener to the machine
5.
Water softener
4
8
7
These machines drain the water through
5 - Power switch
6 - Steam arm
7 - Feet
8 - Drip tray
2
3
4
5
6
Level indicator
9 - Drain tray
10 - Boiler Pressure Gauge
11 - Hot Water Outlet
12 - Hot Water Outlet handle
1
3
Water supply:
Tap water
Element wattage:
2,500 W
Boiler capacity:
5 L.
A = 360 mm
B = 290 mm
C = 480 mm
A
B
C
4
2
2
4
1
5

Advertisement

Table of Contents
loading

Table of Contents