TCT1175 Terra Cotta Cap
Remove 2 screws
from front & back
to lift the top off
Termination Cap
Collar
2 in. (51 mm)
Minimum Height
Chase Top
Chimney
Pipe
Termination cap pipe and chimney section must overlap
1-1/2 in. (38 mm)
Figure 9.7
Installing a TCT1175 Terra Cotta Cap
Place waterproof sealer
under each flange of the
termination cap and on
top of each screw to
help prevent leaks.
The last section of pipe
must stop between 2 in.
(51 mm) above top of
chase and 7 in. (178 mm)
below top of chase
2 in. (51 mm)
7 in. (178 mm)
Chase
Heat & Glo • BAY-40, PIER-40 • 34977 • Rev AA 1/11