Harman Stove Company Accentra Installation & Operating Manual page 12

Pellet stove
Hide thumbs Also See for Accentra:
Table of Contents

Advertisement

12
When installing the Accentra in a mobile home several
requirements must be followed:
1. The unit must be bolted to the floor. This can be done
with 1/4" lag screws through the 2 holes in the base plate
shown in Fig. 16
2. The unit must also be connected to outside air. See
page 15.
3. Floor protection and clearances must be followed as
shown on page 10.
4. Unit must be grounded to the metal frame of the
mobile home.
5. Chimney must meet requirements of CAN/
ULC-S629, Standard for 650°C Factory Built Chimneys.
Follow Manufacturer's guidelines concerning height
and clearances to combustibles. Use the same
manufacturer's components to provide an effective
vapor barrier where the chimney or other component
penetrates to the the exterior of the mobile home.
dO NOT mIX COmPONENTS FrOm dIFFErENT
mANuFACTurErS. The top section of chimney and
the chimney cap must be removable to a maximum
height of 13.5' for transport of the mobile home.
CAuTION: This appliance must be vented to the
outside.
Due to high temperatures, the Accentra should be
placed out of traffic and away from furniture and
draperies. Children and adults should be alerted to
the hazards of high surface temperatures and should
stay away to avoid burn to skin and/or clothing. Young
children should be carefully supervised when they are
in the same room as the stove. Clothing and other
flammable materials should not be placed on or near
the Accentra Pellet Stove.
Installation and repair of the Accentra Pellet Stove
should be done by a qualified service person. The
appliance should be inspected before use and at
least annually by a qualified service person. More
frequent cleaning will be required. It is imperative that
control compartments, burners, and circulating air
passageways of the Accentra be kept clean.
wArNINg! dO NOT INSTAll IN SlEEPINg rOOm
mObIlE hOmE INSTAllATION ShOuld bE dONE
IN ACCOrdANCE wITh ThE mANuFACTurEd
hOmE ANd SAFETY STANdArd (hud), CFr 3280,
PArT 24.
AFTEr ThE INSTAllATION IS COmPlETE
Before the first fire is lit, check and record the high
and low draft reading numbers on page 13. Make
adjustments to the low draft at this time, if necessary.
mobile home Installation
Fig. 16
Unit bolt down holes for mobile home installation lag
to floor with 1/4" diameter lag bolts with washer. (not
supplied.) Note: If the optional leg kit is used, a longer
bolt will be required.
Canadian Standard ulC S627 requires that all
outdoor-aired space heaters must be attached to
the structure.
CAuTION
ThE STruCTurAl INTEgrITY OF ThE
mObIlE hOmE FlOOr, wAll, ANd
CEIlINg/rOOF muST bE mAINTAINEd.
CAuTION
ThE STOvE IS hOT whIlE IN OPErATION.
KEEP ChIldrEN, ClOThINg ANd FurNITurE
AwAY. CONTACT mAY CAuSE SKIN burNS.
wArNINg
KEEP COmbuSTIblE mATErIAlS SuCh AS
grASS, lEAvES, ETC. AT lEAST 3 FEET AwAY
FrOm ThE POINT dIrECTlY uNdEr ThE vENT
TErmINATION.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents