Curb insulation, cant strips, flashing and general
roofing material are furnished by the contractor.
The curbs must be supported on parallel sides by roof mem-
bers. The roof members must not penetrate supply and re-
turn duct opening areas as damage to the unit might occur.
NOTE: The unit and curb accessories are designed to allow
vertical duct installation before unit placement. Duct
installation after unit placement is not recommended.
A
 
 
 
. T
LL
CURBS
LOOK
SIMILAR
O
 
 
 
 
CHECK
JOB
PLANS
CAREFULLY
. I
 
ASSEMBLY
NSTRUCTIONS
MAY
 
.
INFORMATION
SHOWN
See the manual shipped with the roof curb for assembly and
installation instructions.

CLEARANCES

48"
36" MIN.
UNIT CLEARANCES
Adequate clearance around the unit should be kept for safety,
service, maintenance, and proper unit operation. A total clear-
ance of 75" on the main control panel side of the unit is rec-
ommended to facilitate possible fan shaft, coil, electric heat
and gas furnace removal. A clearance of 48" is recommended
on all other sides of the unit to facilitate possible compressor
removal, to allow service access and to insure proper venti-
lation and condenser airflow. The unit must not be installed
beneath any obstruction. The unit should be installed re-
mote from all building exhausts to inhibit ingestion of exhaust
air into the unit fresh air intake.
CAUTION
 
 
 
 
AVOID
INCORRECT
CURB
POSITIONING
 
 
 
 
AND
VERIFY
MARKINGS
ON
CURB
 
 
 
 
 
 
VARY
IN
CURB
STYLES
AND
SUPERCEDE
48"
75"
6"
 
 

ROOF CURB POST-INSTALLATION

After installation, check the top of the curb, duct connection
frame and duct flanges to make sure gasket has been ap-
plied properly. Gasket should be firmly applied to the top of
the curb perimeter, duct flanges and any exposed duct con-
nection frame. If gasket is loose, re-apply using strong
weather resistant adhesive.
P
ROTRUSION
Inspect curb to ensure that none of the utility services (elec-
tric) routed through the curb protrude above the curb.
I
 
F
PROTRUSIONS
I
NFORMATION

ROOF TOP DUCT CONNECTIONS

Install all duct connections on the unit before placing the unit
on rooftop.
H
D
ORIZONTAL
For horizontal discharge, remove the supply and return duct
covers and place them over the vertical discharge return and
supply openings. Install with insulation facing up, using the
longer screws provided in the literature package.
6
ROOF CURB INSTALLATION

CHECKS

CAUTION
 
 
 
 
 
EXIST
DO
NOT
ATTEMPT
TO
SET
 
.
SHOWN
ISCHARGE
INSULATED
PANELS
 
 
 
UNIT
ON
CURB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpg090Cpg102Cpg150

Table of Contents