The rating plate is stamped with the model number, type of
gas and gas input rating. Make sure the unit is equipped to
operate on the type of gas available. The gas line installation
must comply with local codes, or in the absence of local codes,
with the latest edition of the National Fuel Gas Code NFPA
54/ANSI Z223.1.
Natural Gas Connection
Natural Gas Capacity of Pipe
in Cubic Feet of Gas Per Hour (CFH)
Nominal Black Pipe Size (inches)
Length of
Pipe in Feet
1/2
10
132
20
92
30
73
40
63
50
56
60
50
70
46
80
43
90
40
100
38
Pressure = .50 PSIG or less and Pressure Drop of 0.3" W.C. (Based
on 0.60 Specific Gravity Gas)
BT UH Furnace Input
C FH =
H eating Value of G as (BTU/Cubic Foot)
Refer to the Proper Piping Practice drawing for the general
layout at the unit. The following rules apply:
1. Use black iron pipe and fittings for the supply piping.
The use of a flex connector and/or copper piping is
permitted as long as it is in agreement with local
codes.
2. Use pipe joint compound on male threads only. Pipe
joint compound must be resistant to the action of the
fuel used.
3. Use ground joint unions.
4. Install a drip leg to trap dirt and moisture before it can
enter the gas valve. The drip leg must be a minimum
of three inches long.
5. Use two pipe wrenches when making connection to
the gas valve to keep it from turning.
6. Install a manual shut-off valve in a convenient location
(within six feet of unit) between the meter and the
unit.
7. Tighten all joints securely.
8. The unit must be connected to the building piping by
one of the following methods:
• Rigid metallic pipe and fittings
• Semirigid metallic tubing and metallic fittings
(Aluminum alloy tubing must not be used in exterior
locations)
• Listed gas appliance connectors used in accordance
with the terms of their listing that are completely in
the same room as the equipment
• In the prior two methods above the connector or
tubing must be protected from physical and thermal
damage. Aluminum alloy tubing and connectors must
be coated to protect against external corrosion when
in contact with masonry, plaster or insulation or are
subject to repeated wettings by liquids (water - not
rain water, detergents or sewage).
1
3/4
1 1/4
1 1/2
278
520
1050
1600
190
350
730
1100
152
285
590
980
130
245
500
760
115
215
440
670
105
195
400
610
96
180
370
560
90
170
350
530
84
160
320
490
79
150
305
460
DOOR
PROVIDE CLEARANCE
FOR REMOVAL OF
ACCESS PANELS
MANUAL
SHUTOFF VALVE
PROPER PIPING PRACTICE
NOTE: The unit gas supply entrance is factory sealed with
plugs. Keep plugs in place until gas supply is ready to be
installed. Once ready, replace the plugs with the supplied
grommets and install gas supply line.
G
P
C
AS
IPING
HECKS
T
 
 
 
O
PREVENT
PROPERTY
DAMAGE
 
 
THE
FOLLOWING
INSTRUCTIONS
 
 
CONNECTIONS
AND
PRESSURE
 •   T
 
 
 
 
HE
UNIT
AND
ITS
GAS
 
 
 
BEFORE
PLACING
IN
OPERATION
 
 
EXPLOSION
OR
FIRE
NEVER
 
. N
 
FOR
LEAKS
EVER
EXCEED
H
 
 
IGHER
PRESSURE
MAY
 
 
OVERFIRING
WHICH
MAY
.
FAILURE
•    T
 
 
 
 
HIS
UNIT
AND
ITS
SHUT
 
 
 
THE
GAS
SUPPLY
DURING
 
 
 
AT
TEST
PRESSURES
IN
•    T
 
 
 
 
HIS
UNIT
MUST
BE
ISOLATED
 
 
CLOSING
ITS
MANUAL
 
 
 
 
TESTING
OF
THE
GAS
SUPPLY
 
 
 
 
EQUAL
TO
OR
LESS
THAN
T
 
 
 
O
AVOID
PROPERTY
DAMAGE
 
 
 
 
 
NO
OPEN
FLAME
IN
THE
VICINITY
There will be air in the gas supply line after testing for leaks
on a new installation. Therefore, the air must be bled from
the line by loosening the ground joint union until pure gas is
expelled. Tighten union and wait for five minutes until all gas
has been dissipated in the air. Be certain there is no open
flame in the vicinity during air bleeding procedure. The unit is
placed in operation by closing the main electrical disconnect
switch for the unit.
11
GROUND JOINT
UNION
CAUTION
 
 
 
 
OR
PERSONAL
INJURY
DUE
 
 
 
 
MUST
BE
PERFORMED
REGARDING
 
:
TESTING
 
 
 
 
 
CONNECTIONS
MUST
BE
LEAK
. B
 
 
 
ECAUSE
OF
THE
DANGER
 
 
 
 
 
 
USE
A
MATCH
OR
OPEN
FLAME
 
 
 
SPECIFIED
PRESSURES
FOR
 
 
 
 
 
DAMAGE
GAS
VALVE
AND
CAUSE
 
 
 
 
RESULT
IN
PREMATURE
HEAT
 
 
 
 
OFF
VALVE
MUST
BE
DISCONNECTED
 
 
 
 
 
ANY
PRESSURE
TESTING
OF
 
 
 1/2 PSIG (3.48 
EXCESS
OF
K
 
 
 
 
FROM
THE
GAS
SUPPLY
 
 
 
 
 
SHUT
OFF
VALVE
DURING
ANY
 
 
 
 
 
PIPING
SYSTEM
AT
TEST
 1/2 PSIG (3.48 
P
).
K
A
WARNING
 
 
 
 
OR
PERSONAL
INJURY
BE
 
 
 
.
DURING
AIR
BLEEDING
DRIP LEG
 
 
TO
FIRE
 
 
GAS
 
TESTED
 
 
OF
 
 
 
TO
TEST
 
TESTING
 
 
 
EXCHANGE
 
 
FROM
 
 
THAT
SYSTEM
P
).
A
 
 
 
SYSTEM
BY
 
PRESSURE
 
PRESSURES
 
 
 
SURE
THERE
IS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpg090Cpg102Cpg150

Table of Contents