Installation; Gas Connection - AEG 99852 G Operating Instructions Manual

Hide thumbs Also See for 99852 G:
Table of Contents

Advertisement

Installation

Important
This hob must be installed by qualified personnel to the relevant British Standards.
Any gas installation must be carried out by a CORGI registered installer.
The manufacturer will not accept liability, should the above instructions or any of the
other safety instructions incorporated in this book be ignored.
On the end of the shaft, which includes the GJ 1/2" threaded elbow, adjustment is fixed so
that the washer is fitted between the components as shown in the diagram. Screw the
parts together without using excessive force.

Gas Connection

Connection to the gas supply should be with either rigid or semi-rigid pipe, i.e. steel or
copper.
The connection should be suitable for connecting to RC 1/2 (1/2 BSP male thread).
When the final connection has been made, it is essential that a thorough leak test is
carried out on the hob and installation.
Ensure that the main connection pipe does not exert any strain on the hob.
It is important to install the elbow correctly, with the shoulder on the end of the thread,
fitted to the hob connecting pipe.
Failure to ensure the correct assembly will cause leakage of gas.
FO 0264
A) Ramp with ending nut
B) Seal
C) Elbow
Instructions for the Installer
FO 0814
13

Advertisement

Table of Contents
loading

Table of Contents