Combustion Analysis - Ferroli FERSYSTEM TECH 38 C Instructions For Use, Installation And Maintenance

Wall-mounted boiler
Table of Contents

Advertisement

Opening the casing
To open the boiler casing, you need to follow the sequence given below
and the instructions of fig. 29.
1 Using a screwdriver, fully unscrew and remove the 2 screws "A "
2 Open by lowering the panel "B "
3 Lift and take off the casing "C "
Cleaning the boiler and burner
The body and burner must not be cleaned with chemical products or wire brushes. Special care must
be taken over all the sealing systems pertaining to the sealed chamber (gaskets, cable clamps, etc.). In
addition, it is necessary to pay attention after performing all these operations to check and carry out all
the phases of ignition and thermostat operation, the gas valve and circulation pump.
After these checks, make sure there are no gas leaks.

Combustion analysis

It is possible to analyse the combustion through
the air and flue sampling points shown in fig.
16.
To make the measurement, it is necessary to:
1) Open the flue sampling point
2) Insert the probe;
3) Press CH button
5 seconds to turn on TEST mode;
4) Wait 10 minutes for the boiler to stabilize
5) Take the measurement.
NAT GAS; CO2 reading should be 8.7 to 9.0%
L.P.G; CO2 reading should be 9.5 to 10%
Readings taken with an unstabilized boiler will cause measurement errors.
28
FERSYSTEM TECH 38 C
fig. 29
(part. 3, 4 - fig. 1) for
Cod. 3540U330 - 09/2009 (Rev. 00)
fig. 30

Advertisement

Table of Contents
loading

Table of Contents