Drolet ECO-45 Owner's Manual page 9

Table of Contents

Advertisement

B. VERTICALLY WITH NEW CHIMNEY SYSTEM (Refer to Figure
9 – Venting through roof)
NOTE: Follow Vent chimney manufacturer's instructions.
OPTION: To achieve a centered vertical installation, a 45º elbow
and a clean-out tee can be used to offset the pipe from the exhaust
outlet to the rear center of the stove.
OPTION: Install Vent elbow in place of clean-out tee. Locate stove.
Drop plumb bob to center of tee outlet, mark point on ceiling. Install
ceiling support and Vent pipe per Vent manufacturer's instructions.
1.
Always maintain 3" clearance from combustible materials.
When passing through additional floors or ceilings, always
install firestop spacer.
2.
After lining up for hole in roof, cut either a round or square hole
in roof, always 3" larger all the way around pipe. Install upper
edge and sides of flashing under roofing materials, nail to the
roof along upper edge. Do not nail lower edge. Seal nail heads
with flexible waterproof sealant.
3.
Apply flexible, waterproof sealant where the storm collar meets
the vent. Slide storm collar down until it sits on the flashing.
Seal and install cap. Mobile home installations must use a
spark arrester.
C. VERTICALLY INTO EXISTING CHIMNEY SYSTEM
As an alternative, 3" or 4" vent can be run inside existing chimney to
termination(Figure 11). This is the preferred method.
Follow guidelines for equivalent vent length.
FOLLOW CHIMNEY OR
VENT MANUFACTURER'S
INSTRUCTIONS
FOR BASEMENT INSTALLATION
A 4" PIPE IS RECOMMANDED
BASEMENT INSTALLATION
FIGURE 10
Basement installation
INSTALLATION
WALL
STRAP
CLEAN OUT
TEE
CLEAN OUT
TEE
FIGURE 9
Venting through roof
FIGURE 11
Venting through
existing chimney
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco-45 dp00045

Table of Contents