Final Assembly - Chamberlain Secure Home SH-9132AU Installation And Operating Instructions Manual

Motion sensing coach light
Table of Contents

Advertisement

WIRING
WARNING: Turn power off at circuit
breaker or fuse. Place tape over circuit
breaker switch and verify power is off at
the fixture.
WARNING: Risk of electric shock.
Terminal block insulator must cover
terminal block after wiring is complete.
IMPORTANT: Mounting bracket must be
earthed. Attach earth wire to bracket at the
earth screw. Tighten earth screw securely
against earth wire.
Connect the fixture wires to the terminal block
according to diagram. Make sure all screws on
terminal block are tightened securely and terminal
block insulator is folded over terminal block.
Terminal Block
From Fixture
Brown
Blue
Green/Yellow
From AC Source
Red or Brown
Blue or Black
Green/Yellow
Figure 3

FINAL ASSEMBLY

1. Double check all wiring connections.
2. Slide the fixture assembly onto the mounting
screws as shown on outer carton packaging. Make
sure wires do not obstruct mounting screws (see
Figure 4).
3. Tighten decorative nuts removed in step 1 of In-
stallation section securely against fixture base.
4. Caulk around fixture base with silicone weather
sealant. IMPORTANT: Ensure that the drain hole
at the bottom of the unit is not blocked.
5. Install bulb. Do not exceed wattage rating on
fixture label.
6. If applicable, install fixture top using two
decorative screws (see Figure 5).
7. If applicable, remove nut below sensor and
install fixture tail assembly (see Figure 6). Use
the nut removed to secure the tail assembly.
Terminal Block Insulator
Decorative Nut
Mounting Bracket
4
Mounting Screw
Wall
Figure 4
201101-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secure home sh-9138auSecure home sh-9133auSecure home sh-9144auSecure home sh-9150au

Table of Contents