6.
In order to discharge the DC link capacitors, start once more
the inverter on each unit through the screen:
MENU/COMMAND MENU/INVERTER ON
Remark:
command INVERTER ON will be enabled only when
the inverter voltage of each phase decreases
below 7 VAC (about 30 seconds).
Before proceeding to step 7, check on the display panel that
the DC link voltage (both polarities) Udcp and Udcn has reached
the minimum voltage of 5 VDC (about 30 seconds).
7.
Switch OFF the inverter on each unit entering the screen:
MENU/COMMAND MENU/INVERTER OFF
The load is now supplied directly from the mains through the manual switches Q2.
WARNING !
The UPS cabinet contains parts electrically live.
Apart from the front door, do not open any other part of the UPS.
NOTE !
With separate mains inputs, it's possible to disconnect mains rectifier.
Modifications reserved
OPM_LPS_3UO_50K_60K_0US_V010.doc
END OF PROCEDURE
COMMAND MENU
INVERTER ON
INVERTER OFF
INVERTER:
U1= 7V
U2= 7V
U3= 7V
Frequency = 60.0Hz
Synchronized
Udcp= 5V
Udcn= 5V
Ubp=0V
Ubn=0V O
Charge level
= 0%
Autonomy
= 0min
COMMAND MENU
INVERTER ON
INVERTER OFF
Operating Manual LP 33 Series 50 & 60 kVA
*
*
Page 46/57