Installing The Cable Management Tie - Vizio S4221w-C4 Quick Start Manual

High definition sound bar with wireless subwoofer
Table of Contents

Advertisement

INSTALLING THE CABLE MANAGEMENT TIE

The Cable Management Tie can be used to organize the input and power
cables behind the sound bar.
1.
Place the Sound Bar face down on a non-marring or soft flat level surface.
Insert the Tie into the hole on the center of the Sound Bar.
2.
3.
Insert the Pin into the Tie to secure the Cable Management Tie.
To remove the Cable Management Tie, remove the Pin and gently pull the Tie.
4.
Tie
22
Pin

Advertisement

Table of Contents
loading

Table of Contents